30 research outputs found

    Conceptualising the FinDD API plug-in: A study of BIM-FM integration

    Get PDF
    © 2017 This research paper reports upon a client driven approach to iteratively develop the FinDD application programming interface (API) plug-in. FinDD integrates building information modelling (BIM) and facilities management (FM) via the novel development and application of totems. Totems visualise rich semantic FM data in a 3D object to extend the use and application of COBie thereby minimising costs incurred by the FM team to update and maintain the as-built BIM. Participatory action research was used to develop the proof of concept and involved a study of two multi-storey, mixed-use educational buildings (with a contract value worth ≄£150 million UK Sterling) located within Birmingham, UK. The lead researcher worked for the client's estates department and was instrumental in liaising with members of the project management team, synthesising their semantic data requirements and developing the FinDD API plug-in for Autodesk Revit. Research findings reveal that whilst FinDD was positively received as a bespoke extension of COBie (that was tailored to specifically meet client needs), further development is required to mitigate software inflexibility and augment automation of semantic data transfer, storage and analysis. Future work will validate the API plug-in via user experience and integrate additional databases such as post occupancy evaluations (POE)

    Vision and advocacy of optoelectronic technology developments in the AECO sector

    Get PDF
    Purpose This research presents a literature review of laser scanning and 3D modelling devices, modes of delivery and applications within the architecture, engineering, construction and owner-operated (AECO) sector. Such devices are inextricably linked to modern digital built environment practices, particularly when used in conjunction with as-built building information modelling (BIM) development. The research also reports upon innovative technological advancements (such as machine vision) that coalesce with 3D scanning solutions. Design/methodology/approach A synthesis of literature is used to develop: a hierarchy of the modes of delivery for laser scan devices; a thematic analysis of 3D terrestrial laser scan technology applications; and a componential cross-comparative tabulation of laser scan technology and specifications. Findings Findings reveal that the costly and labour intensive attributes of laser scanning devices have stimulated the development of hybrid automated and intelligent technologies to improve performance. Such developments are set to satisfy the increasing demand for digitisation of both existing and new buildings into BIM. Future work proposed will seek to: review what coalescence of digital technologies will provide an optimal and cost effective solution to accurately reconstructing the digital built environment; conduct case studies that implement hybrid digital solutions in pragmatic facilities management scenarios to measure their performance and user satisfaction; and eliminate manual remodelling tasks (such as point cloud reconstruction) via the use of computational intelligence algorithms integral within cloud based BIM platforms. Originality/value Although laser scanning and 3D modelling have been widely covered en passant within the literature, scant research has conducted an holistic review of the technology, its applications and future developments. This review presents concise and lucid reference guidance that will intellectually challenge, and better inform, both practitioners and researchers

    From BIM towards digital twin: Strategy and future development for smart asset management

    Get PDF
    With the rising adoption of Building Information Model (BIM) for as-set management within architecture, engineering, construction and owner-operated (AECO) sector, BIM-enabled asset management has been increasingly attracting more attentions in both research and practice. This study provides a comprehensive review and analysis of the state-of-the-art latest research and industry standards development that impact upon BIM and asset management within the operations and maintenance (O&M) phase. However, BIM is not always enough in whole-life cycle asset management, especially in the O&M phase. Therefore, a framework for future development of smart asset management are proposed, integrating the concept of Digital Twin (DT). DT integrates artificial intelligence, machine learning and data analytics to create dynamic digital models that are able to learn and update the status of the physical counterpart from multiple sources. The findings will contribute to inspiring novel research ideas and promote wide-spread adoption of smart DT-enabled asset management within the O&M phaseCentre for Digital Built Britain, Innovate U

    Developing a dynamic digital twin at a building level: Using Cambridge campus as case study

    Get PDF
    A Digital Twin (DT) refers to a digital replica of physical assets, processes and systems. DTs integrate artificial intelligence, machine learning and data analytics to create dynamic digital models that are able to learn and update the status of the physical counterpart from multiple sources. A DT, if equipped with appropriate algorithms will represent and predict future condition and performance of their physical counterparts. Current developments related to DTs are still at an early stage with respect to buildings and other infrastructure assets. Most of these developments focus on the architectural and engineering/construction point of view. Less attention has been paid to the operation & maintenance (O&M) phase, where the value potential is immense. A systematic and clear architecture verified with practical use cases for constructing a DT is the foremost step for effective operation and maintenance of assets. This paper presents a system architecture for developing dynamic DTs in building levels for integrating heterogeneous data sources, support intelligent data query, and provide smarter decision-making processes. This will further bridge the gaps between human relationships with buildings/regions via a more intelligent, visual and sustainable channels. This architecture is brought to life through the development of a dynamic DT demonstrator of the West Cambridge site of the University of Cambridge. Specifically, this demonstrator integrates an as-is multi-layered IFC Building Information Model (BIM), building management system data, space management data, real-time Internet of Things (IoT)-based sensor data, asset registry data, and an asset tagging platform. The demonstrator also includes two applications: (1) improving asset maintenance and asset tracking using Augmented Reality (AR); and (2) equipment failure prediction. The long-term goals of this demonstrator are also discussed in this paper

    Vision and advocacy of optoelectronic technology developments in the AECO sector

    No full text
    Purpose: The purpose of this paper is to present a literature review of laser scanning and 3D modelling devices, modes of delivery and applications within the architecture, engineering, construction and owner-operated sector. Such devices are inextricably linked to modern digital built environment practices, particularly when used in conjunction with as-built building information modelling (BIM) development. The research also reports upon innovative technological advancements (such as machine vision) that coalesce with 3D scanning solutions. Design/methodology/approach: A synthesis of literature is used to develop: a hierarchy of the modes of delivery for laser scan devices; a thematic analysis of 3D terrestrial laser scan technology applications; and a componential cross-comparative tabulation of laser scan technology and specifications. Findings: Findings reveal that the costly and labour intensive attributes of laser scanning devices have stimulated the development of hybrid automated and intelligent technologies to improve performance. Such developments are set to satisfy the increasing demand for digitisation of both existing and new buildings into BIM. Future work proposed will seek to: review what coalescence of digital technologies will provide an optimal and cost-effective solution to accurately re-constructing the digital built environment; conduct case studies that implement hybrid digital solutions in pragmatic facilities management scenarios to measure their performance and user satisfaction; and eliminate manual remodelling tasks (such as point cloud reconstruction) via the use of computational intelligence algorithms integral within cloud-based BIM platforms. Originality/value: Although laser scanning and 3D modelling have been widely covered en passant within the literature, scant research has conducted a holistic review of the technology, its applications and future developments. This review presents concise and lucid reference guidance that will intellectually challenge, and better inform, both practitioners and researchers

    Conceptualising the FinDD API plug-in: A study of BIM-FM integration

    No full text
    © 2017 This research paper reports upon a client driven approach to iteratively develop the FinDD application programming interface (API) plug-in. FinDD integrates building information modelling (BIM) and facilities management (FM) via the novel development and application of totems. Totems visualise rich semantic FM data in a 3D object to extend the use and application of COBie thereby minimising costs incurred by the FM team to update and maintain the as-built BIM. Participatory action research was used to develop the proof of concept and involved a study of two multi-storey, mixed-use educational buildings (with a contract value worth ≄£150 million UK Sterling) located within Birmingham, UK. The lead researcher worked for the client's estates department and was instrumental in liaising with members of the project management team, synthesising their semantic data requirements and developing the FinDD API plug-in for Autodesk Revit. Research findings reveal that whilst FinDD was positively received as a bespoke extension of COBie (that was tailored to specifically meet client needs), further development is required to mitigate software inflexibility and augment automation of semantic data transfer, storage and analysis. Future work will validate the API plug-in via user experience and integrate additional databases such as post occupancy evaluations (POE)

    Origins and probabilities of MEP and structural design clashes within a federated BIM model

    No full text
    ‘Design clashes’ encountered during the development of a large multi-storey educational building, awarded under a Joint Contracts Tribunal (JCT) Design and Build contract, are reported upon. The building was developed in Birmingham, UK and the contract value was circa ÂŁ36 million (UK Sterling, 2015). Members of the project management team (PMT) produced designs that were subsequently integrated by the main contractor into a federated building information modelling (BIM) model; at this stage 404 error clashes were evident between the positions of the mechanical, electrical and plumbing (MEP) designer's and structural designer's building compartments. The contractor deemed that these particular clashes were ‘mission critical’ as previous experience suggested that project costs could spiral uncontrollably if left unabated. Participatory action research was employed to acquire a deeper understanding and knowledge of the clash incidents. Clash data accrued (in mm) was subsequently quantitatively modelled using the probability density function (PDF) and the cumulative distribution function (CDF). Two models produced were the Log Logistic Three Parameter (3P) (using all data including outliers) and Generalized Gamma distribution (excluding outliers). Both models satisfied Anderson-Darling and Kolmogorov-Smirnov goodness of fit tests at α 0.01 and 0.02 levels of significance. Model parameters could be used to forecast similar clashes occurring on future projects and will prove invaluable to PMT members when accurately estimating the time and resource needed to integrate BIM designs. The predictive modelling revealed that 92.98% of clashes reside within the 30–299 mm range while the most probable occurrence of a clash overlap resides in a discrete category of 100–199 mm. Further qualitative investigation is also conducted to understand why these clashes occurred and propagate ideas about how such may be mitigated. The research concludes on two important points, namely: i) BIM is not a panacea to design related construction project rework and that innovative 21st century digital technologies are hampered by 20th century management practices; and ii) improvements in clash and error mitigation reside in a better understanding of tolerances specified to alleviate the erroneous task of resolving unnecessary clashes. Future research is proposed that seeks to: automate the clash detection management, analysis and resolution process; conduct further investigative analysis of the organizational and human resource management influences impacting upon design clash propagation; and devise and validate new procedural methods to mitigate clash occurrence using a real-life project

    Brexit: measuring the impact upon skilled labour in the UK construction industry

    No full text
    Purpose: The purpose of this paper is to present an understanding of the potential impact of Brexit upon the UK construction industry. Specifically, the work analyses the construction industry’s reliance upon European Union (EU) skilled labour and seeks to determine the potential impact that Brexit poses upon EU skilled labour entering the sector. Design/methodology/approach: A perceptual questionnaire survey was used to elicit responses from construction professionals using the two techniques of opportunity and snowballing non-probability sampling. Summary statistical analysis of Boolean and Likert item scale data accrued was employed to elucidate upon respondents’ perceptions. Findings: The majority of survey participants either “strongly agreed” or “agreed” that the UK construction industry relies upon EU skilled labour and that a career in the sector would not be attractive for foreign skilled labour post-Brexit. Future research proposed includes: predicting future trends in labour supply and demand and deriving new policies to address skills shortage imbalances that may be created by Brexit. Originality/value: Original insight into an historic and unprecedented moment for the UK construction industry is presented. The work also provides pragmatic recommendations to policy makers and Higher Education Institutes to prevent the risk of Brexit further exacerbating skilled labour shortages within the industry